Bid Process has begun for LPC's Transmission Line and Booster Pump Station
ADVERTISEMENT FOR
BIDS
LIBERTY PIPELINE COMPANY; LIBERTY, UTAH
SOUTH ZONE BOOSTER TRANSMISSION LINE
Liberty Pipeline Company (Owner) is requesting Bids for the
construction of the following Project:
SOUTH ZONE BOOSTER
TRANSMISSION LINE
(J-U-B Project Number #55-23-019)
Bids for the construction of the Project will be received prior to
the bid opening at P.O. Box 1200, Eden Utah, 84310 or at the bid opening on Wednesday,
January 10, 2024, at 10:00 AM local time. At that time, the
Bids received will be publicly opened and read.
The Project includes the following
Work:
·
Installation of approximately 11,750 LF of
8-inch C900 PVC waterline
·
Installation of various valves and fittings
·
Restoration of various disturbed surfaces
The Project is expected to be substantially
complete by November 1, 2024, with final completion by December 1,
2024.
Information and Bidding Documents for the
project will be made available on December 1, 2023 and electronic copies
of the plans and contract documents in pdf format will be available on the
following designated websites:
www.questcdn.com #8836918
Pre-bid Conference
Instructions to
Bidders.
For all further requirements regarding bid submittal, qualifications,
procedures, and contract award, refer to the Instructions to Bidders that are included
in the Bidding Documents.
This Advertisement is issued by:
Engineer: J-U-B
Engineers
By: Nathan
Smith
Title: Project Manager
Date: November
10, 2023
Contact: nsmith@jub.comADVERTISEMENT FOR
BIDS
LIBERTY PIPELINE COMPANY; LIBERTY, UTAH
SOUTH ZONE BOOSTER PUMP STATION
Liberty Pipeline Company (Owner) is requesting Bids for the
construction of the following Project:
SOUTH ZONE
BOOSTER PUMP STATION
(J-U-B Project Number #55-23-019)
Bids for the construction of the Project will be received prior to
the bid opening at P.O. Box 1200, Eden Utah, 84310 or at the bid opening on Wednesday,
January 10, 2024, at 10:00 AM local time. At that time, the
Bids received will be publicly opened and read.
The Project includes the following Work:
·
Construction of 480 SF CMU booster pump station/meeting
room.
·
Installation of a pump skid featuring two 50 HP
pumps, SCADA, piping, and various valves and fittings.
·
Site improvements including grading, utility
relocation, asphalt paving, and concrete flatwork.
The Project is expected to be substantially
complete by November 1, 2024, with final completion by December 1,
2024.
Information and Bidding Documents for the
project will be made available on December 1, 2023 and electronic copies
of the plans and contract documents in pdf format will be available on the
following designated websites:
www.questcdn.com #8836920
Pre-bid Conference
Instructions to
Bidders.
For all further requirements regarding bid submittal, qualifications,
procedures, and contract award, refer to the Instructions to Bidders that are
included in the Bidding Documents.
This Advertisement is issued by:
Engineer: J-U-B
Engineers
By: Nathan
Smith
Title: Project Manager
Date: November
10, 2023
Contact: nsmith@jub.com